US Bridges

Jeff Fuqua Blvd S over Rail Corridor

Good

Orange County, Florida · 1.5 M N/O Heintzelman · Structure no. 755955

Built
2016
9 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
211 ft
3 main spans
Daily traffic
28,500
2023 count
Owner
Local
Other Local Agency

About this bridge

Jeff Fuqua Blvd S over Rail Corridor is a concrete stringer/multi-beam or girder carrying Jeff Fuqua Blvd S over Rail Corridor in Orange County, Florida. It was built in 2016, so it is 9 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 28,500 vehicles a day, projected to reach 49,448 by 2042. The structure is 211 ft (64.3 m) long and 40 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesJeff Fuqua Blvd S
CrossesRail Corridor
Location1.5 M N/O Heintzelman
StateFlorida
Coordinates28.41767, -81.30617
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60.1 US tons
Inventory rating46.4 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length211 ft (64.3 m)
Longest span85 ft (25.9 m)
Deck width40 ft (12.1 m)
Roadway width37 ft (11.4 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic28,500 (2023)
Projected traffic49,448 by 2042
Trucks0%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesRailroad
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Jeff Fuqua Blvd S over Rail Corridor built?

It was built in 2016, making it 9 years old in 2025.

What condition is Jeff Fuqua Blvd S over Rail Corridor in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Jeff Fuqua Blvd S over Rail Corridor carry?

About 28,500 vehicles per day (2023 count).

How long is Jeff Fuqua Blvd S over Rail Corridor?

The structure is 211 ft (64.3 m) long with a longest span of 85 ft (25.9 m) and a deck 40 ft wide.

Who owns Jeff Fuqua Blvd S over Rail Corridor?

It is owned by the Other Local Agency.