US Bridges

Terminal C Access over Retention Pond

Good

Orange County, Florida · .1 MI W Jeff Fuqua Blvd. · Structure no. 755953

Built
2016
9 years old
Condition
Good
inspected June 2023
Type
Culvert
Concrete
Length
33 ft
3 main spans
Daily traffic
1,001
2023 count
Owner
Local
Other Local Agency

About this bridge

Terminal C Access over Retention Pond is a concrete culvert carrying Terminal C Access over Retention Pond in Orange County, Florida. It was built in 2016, so it is 9 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,001 vehicles a day, roughly 1% of them trucks, projected to reach 1,737 by 2042. The structure is 33 ft (10 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesTerminal C Access
CrossesRetention Pond
Location.1 MI W Jeff Fuqua Blvd.
StateFlorida
Coordinates28.40863, -81.30716
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating110.1 US tons
Inventory rating110.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHL 93
Structure length33 ft (10 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic1,001 (2023)
Projected traffic1,737 by 2042
Trucks1%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Terminal C Access over Retention Pond built?

It was built in 2016, making it 9 years old in 2025.

What condition is Terminal C Access over Retention Pond in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Terminal C Access over Retention Pond carry?

About 1,001 vehicles per day (2023 count), of which roughly 1% are trucks.

How long is Terminal C Access over Retention Pond?

The structure is 33 ft (10 m) long with a longest span of 10 ft (3 m).

Who owns Terminal C Access over Retention Pond?

It is owned by the Other Local Agency.