3RDLEVEL Enplane a over 2nd Level Deplane a
FairPosted for loadOrange County, Florida · N. Side of Terminal Oia · Structure no. 755910
- Built
- 1981
- 44 years old, rebuilt 1990
- Condition
- Fair
- inspected February 2024
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 1,767 ft
- 48 main spans
- Daily traffic
- 15,001
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
3RDLEVEL Enplane a over 2nd Level Deplane a is a prestressed concrete tee beam carrying 3RDLEVEL Enplane a over 2nd Level Deplane a in Orange County, Florida. It was built in 1981 and reconstructed in 1990, so it is 44 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 15,001 vehicles a day, roughly 5% of them trucks, projected to reach 26,027 by 2042. The structure is 1,767 ft (538.6 m) long and 62 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 3RDLEVEL Enplane a over 2nd Level Deplane a built?
It was built in 1981, making it 44 years old in 2025. It was reconstructed in 1990.
What condition is 3RDLEVEL Enplane a over 2nd Level Deplane a in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does 3RDLEVEL Enplane a over 2nd Level Deplane a carry?
About 15,001 vehicles per day (2024 count), of which roughly 5% are trucks.
How long is 3RDLEVEL Enplane a over 2nd Level Deplane a?
The structure is 1,767 ft (538.6 m) long with a longest span of 90 ft (27.4 m) and a deck 62 ft wide.
Who owns 3RDLEVEL Enplane a over 2nd Level Deplane a?
It is owned by the City or Municipal Highway Agency.