US Bridges

3rd Level Enplan B over 2nd Level Deplane B

FairPosted for load

Orange County, Florida · S. Side of Terminal Oia · Structure no. 755911

Built
1981
44 years old, rebuilt 1990
Condition
Fair
inspected February 2024
Type
Tee Beam
Prestressed Concrete
Length
1,606 ft
44 main spans
Daily traffic
5,339
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

3rd Level Enplan B over 2nd Level Deplane B is a prestressed concrete tee beam carrying 3rd Level Enplan B over 2nd Level Deplane B in Orange County, Florida. It was built in 1981 and reconstructed in 1990, so it is 44 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 5,339 vehicles a day, roughly 5% of them trucks, projected to reach 9,263 by 2042. The structure is 1,606 ft (489.6 m) long and 65 ft wide.

Carries3rd Level Enplan B
Crosses2nd Level Deplane B
LocationS. Side of Terminal Oia
RouteCity Street 0
StateFlorida
Coordinates28.43003, -81.30827
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourBridge not over waterway
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment7: Better than present minimum criteria
Operating rating19.8 US tons
Inventory rating11.9 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans44
Design loadH 15
Structure length1,606 ft (489.6 m)
Longest span81 ft (24.7 m)
Deck width65 ft (19.8 m)
Roadway width23 ft (7 m)
Vertical clearance over deck14 ft (4.2 m)

Traffic and service

Average daily traffic5,339 (2024)
Projected traffic9,263 by 2042
Trucks5%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 3rd Level Enplan B over 2nd Level Deplane B built?

It was built in 1981, making it 44 years old in 2025. It was reconstructed in 1990.

What condition is 3rd Level Enplan B over 2nd Level Deplane B in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does 3rd Level Enplan B over 2nd Level Deplane B carry?

About 5,339 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is 3rd Level Enplan B over 2nd Level Deplane B?

The structure is 1,606 ft (489.6 m) long with a longest span of 81 ft (24.7 m) and a deck 65 ft wide.

Who owns 3rd Level Enplan B over 2nd Level Deplane B?

It is owned by the City or Municipal Highway Agency.