US Bridges

2nd Level Deplan a over Parking Garage

GoodPosted for load

Orange County, Florida · N. Side of Terminal Oia · Structure no. 755908

Built
1981
44 years old, rebuilt 1990
Condition
Good
inspected February 2024
Type
Tee Beam
Prestressed Concrete
Length
1,226 ft
36 main spans
Daily traffic
4,273
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

2nd Level Deplan a over Parking Garage is a prestressed concrete tee beam carrying 2nd Level Deplan a over Parking Garage in Orange County, Florida. It was built in 1981 and reconstructed in 1990, so it is 44 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.

It carries about 4,273 vehicles a day, roughly 5% of them trucks, projected to reach 4,940 by 2042. The structure is 1,226 ft (373.7 m) long and 62 ft wide.

Carries2nd Level Deplan a
CrossesParking Garage
LocationN. Side of Terminal Oia
RouteCity Street 0
StateFlorida
Coordinates28.43218, -81.31031
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourBridge not over waterway
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment7: Better than present minimum criteria
Operating rating17.3 US tons
Inventory rating10.4 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans36
Design loadH 15
Structure length1,226 ft (373.7 m)
Longest span37 ft (11.4 m)
Deck width62 ft (18.8 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deck14 ft (4.4 m)

Traffic and service

Average daily traffic4,273 (2024)
Projected traffic4,940 by 2042
Trucks5%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 2nd Level Deplan a over Parking Garage built?

It was built in 1981, making it 44 years old in 2025. It was reconstructed in 1990.

What condition is 2nd Level Deplan a over Parking Garage in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does 2nd Level Deplan a over Parking Garage carry?

About 4,273 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is 2nd Level Deplan a over Parking Garage?

The structure is 1,226 ft (373.7 m) long with a longest span of 37 ft (11.4 m) and a deck 62 ft wide.

Who owns 2nd Level Deplan a over Parking Garage?

It is owned by the City or Municipal Highway Agency.