US Bridges

Innovation Way over Aaf RR

Good

Orange County, Florida · 0.75MI S of Monument Pkwy · Structure no. 754166

Built
2018
7 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
118 ft
1 main span
Daily traffic
9,400
2022 count
Owner
Toll Authority
State Toll Authority

About this bridge

Innovation Way over Aaf RR is a prestressed concrete stringer/multi-beam or girder carrying Innovation Way over Aaf RR in Orange County, Florida. It was built in 2018, so it is 7 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,400 vehicles a day, roughly 5% of them trucks, projected to reach 16,309 by 2042. The structure is 118 ft (36 m) long and 154 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesInnovation Way
CrossesAaf RR
Location0.75MI S of Monument Pkwy
RouteCounty Highway 0
StateFlorida
Coordinates28.45097, -81.17036
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57.1 US tons
Inventory rating41 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length118 ft (36 m)
Longest span116 ft (35.4 m)
Deck width154 ft (46.8 m)
Roadway width104 ft (31.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,400 (2022)
Projected traffic16,309 by 2042
Trucks5%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway
CrossesOther
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Innovation Way over Aaf RR built?

It was built in 2018, making it 7 years old in 2025.

What condition is Innovation Way over Aaf RR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Innovation Way over Aaf RR carry?

About 9,400 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is Innovation Way over Aaf RR?

The structure is 118 ft (36 m) long with a longest span of 116 ft (35.4 m) and a deck 154 ft wide.

Who owns Innovation Way over Aaf RR?

It is owned by the State Toll Authority.