US Bridges

SR-528 EB over Oucrr & Icp Access RD

Good

Orange County, Florida · 4.2 Mi. E of SR-417 · Structure no. 750333

Built
1984
41 years old, rebuilt 2017
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
195 ft
4 main spans
Daily traffic
30,500
2023 count
Owner
Toll Authority
State Toll Authority

About this bridge

SR-528 EB over Oucrr & Icp Access RD is a prestressed concrete stringer/multi-beam or girder carrying SR-528 EB over Oucrr & Icp Access RD in Orange County, Florida. It was built in 1984 and reconstructed in 2017, so it is 41 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 30,500 vehicles a day, roughly 5% of them trucks, projected to reach 52,918 by 2045. The structure is 195 ft (59.4 m) long and 55 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR-528 EB
CrossesOucrr & Icp Access RD
Location4.2 Mi. E of SR-417
RouteState Highway 528
StateFlorida
Coordinates28.45158, -81.16109
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating52.9 US tons
Inventory rating40.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length195 ft (59.4 m)
Longest span65 ft (19.8 m)
Deck width55 ft (16.8 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30,500 (2023)
Projected traffic52,918 by 2045
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-528 EB over Oucrr & Icp Access RD built?

It was built in 1984, making it 41 years old in 2025. It was reconstructed in 2017.

What condition is SR-528 EB over Oucrr & Icp Access RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does SR-528 EB over Oucrr & Icp Access RD carry?

About 30,500 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is SR-528 EB over Oucrr & Icp Access RD?

The structure is 195 ft (59.4 m) long with a longest span of 65 ft (19.8 m) and a deck 55 ft wide.

Who owns SR-528 EB over Oucrr & Icp Access RD?

It is owned by the State Toll Authority.