US Bridges

Innovation Way over SR-528

Fair

Orange County, Florida · 0.7MI S of Monument Pkwy · Structure no. 754165

Built
2018
7 years old
Condition
Fair
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
240 ft
2 main spans
Daily traffic
9,400
2022 count
Owner
Toll Authority
State Toll Authority

About this bridge

Innovation Way over SR-528 is a prestressed concrete stringer/multi-beam or girder carrying Innovation Way over SR-528 in Orange County, Florida. It was built in 2018, so it is 7 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 9,400 vehicles a day, roughly 5% of them trucks, projected to reach 16,309 by 2042. The structure is 240 ft (73.2 m) long and 154 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesInnovation Way
CrossesSR-528
Location0.7MI S of Monument Pkwy
RouteCounty Highway 0
StateFlorida
Coordinates28.45161, -81.17044
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.1 US tons
Inventory rating42.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length240 ft (73.2 m)
Longest span128 ft (38.9 m)
Deck width154 ft (46.8 m)
Roadway width104 ft (31.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,400 (2022)
Projected traffic16,309 by 2042
Trucks5%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Innovation Way over SR-528 built?

It was built in 2018, making it 7 years old in 2025.

What condition is Innovation Way over SR-528 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does Innovation Way over SR-528 carry?

About 9,400 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is Innovation Way over SR-528?

The structure is 240 ft (73.2 m) long with a longest span of 128 ft (38.9 m) and a deck 154 ft wide.

Who owns Innovation Way over SR-528?

It is owned by the State Toll Authority.