US Bridges

I-4 EB El over US-441

Good

Orange County, Florida · 1.3MI E/O John Young Pkwy · Structure no. 750909

Built
2020
5 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
269 ft
2 main spans
Daily traffic
12,750
2020 count
Owner
State
State Highway Agency

About this bridge

I-4 EB El over US-441 is a prestressed concrete stringer/multi-beam or girder carrying I-4 EB El over US-441 in Orange County, Florida. It was built in 2020, so it is 5 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 12,750 vehicles a day, roughly 1% of them trucks, projected to reach 22,121 by 2040. The structure is 269 ft (82 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-4 EB El
CrossesUS-441
Location1.3MI E/O John Young Pkwy
RouteInterstate 4
StateFlorida
Coordinates28.51022, -81.39711
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47.5 US tons
Inventory rating41.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length269 ft (82 m)
Longest span143 ft (43.6 m)
Deck width44 ft (13.4 m)
Roadway width41 ft (12.5 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic12,750 (2020)
Projected traffic22,121 by 2040
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn an Interstate toll segment under Secretarial agreement
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-4 EB El over US-441 built?

It was built in 2020, making it 5 years old in 2025.

What condition is I-4 EB El over US-441 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does I-4 EB El over US-441 carry?

About 12,750 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is I-4 EB El over US-441?

The structure is 269 ft (82 m) long with a longest span of 143 ft (43.6 m) and a deck 44 ft wide.

Who owns I-4 EB El over US-441?

It is owned by the State Highway Agency.