US Bridges

I-4 EB to Obt NB over Orange Blossom Trail

Good

Orange County, Florida · 1.3MI E of J Young Pkwy · Structure no. 750772

Built
2019
6 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
240 ft
2 main spans
Daily traffic
5,400
2021 count
Owner
State
State Highway Agency

About this bridge

I-4 EB to Obt NB over Orange Blossom Trail is a prestressed concrete stringer/multi-beam or girder carrying I-4 EB to Obt NB over Orange Blossom Trail in Orange County, Florida. It was built in 2019, so it is 6 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,400 vehicles a day, roughly 7% of them trucks, projected to reach 7,610 by 2042. The structure is 240 ft (73 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-4 EB to Obt NB
CrossesOrange Blossom Trail
Location1.3MI E of J Young Pkwy
RouteInterstate 4
StateFlorida
Coordinates28.50992, -81.39697
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating42.5 US tons
Inventory rating38.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length240 ft (73 m)
Longest span145 ft (44.1 m)
Deck width30 ft (9.2 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,400 (2021)
Projected traffic7,610 by 2042
Trucks7%
Lanes on structure1
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-4 EB to Obt NB over Orange Blossom Trail built?

It was built in 2019, making it 6 years old in 2025.

What condition is I-4 EB to Obt NB over Orange Blossom Trail in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does I-4 EB to Obt NB over Orange Blossom Trail carry?

About 5,400 vehicles per day (2021 count), of which roughly 7% are trucks.

How long is I-4 EB to Obt NB over Orange Blossom Trail?

The structure is 240 ft (73 m) long with a longest span of 145 ft (44.1 m) and a deck 30 ft wide.

Who owns I-4 EB to Obt NB over Orange Blossom Trail?

It is owned by the State Highway Agency.