US Bridges

I-4 WB El over Orange Blossom TRL(US17)

Good

Orange County, Florida · 1.4MI E of J Young Pkwy · Structure no. 750769

Built
2019
6 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
271 ft
2 main spans
Daily traffic
30,625
2021 count
Owner
State
State Highway Agency

About this bridge

I-4 WB El over Orange Blossom TRL(US17) is a prestressed concrete stringer/multi-beam or girder carrying I-4 WB El over Orange Blossom TRL(US17) in Orange County, Florida. It was built in 2019, so it is 6 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 30,625 vehicles a day, projected to reach 53,135 by 2041. The structure is 271 ft (82.7 m) long and 41 ft wide.

CarriesI-4 WB El
CrossesOrange Blossom TRL(US17)
Location1.4MI E of J Young Pkwy
RouteInterstate 4
StateFlorida
Coordinates28.5105, -81.39694
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51.8 US tons
Inventory rating38.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length271 ft (82.7 m)
Longest span143 ft (43.7 m)
Deck width41 ft (12.5 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30,625 (2021)
Projected traffic53,135 by 2041
Trucks0%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollToll bridge
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-4 WB El over Orange Blossom TRL(US17) built?

It was built in 2019, making it 6 years old in 2025.

What condition is I-4 WB El over Orange Blossom TRL(US17) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does I-4 WB El over Orange Blossom TRL(US17) carry?

About 30,625 vehicles per day (2021 count).

How long is I-4 WB El over Orange Blossom TRL(US17)?

The structure is 271 ft (82.7 m) long with a longest span of 143 ft (43.7 m) and a deck 41 ft wide.

Who owns I-4 WB El over Orange Blossom TRL(US17)?

It is owned by the State Highway Agency.