US Bridges

I10 SR8 Eastbound over Al & Gc RR

Fair

Escambia County, Florida · 0.1 Miles West of US29 · Structure no. 480064

Built
1961
64 years old
Condition
Fair
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
144 ft
3 main spans
Daily traffic
31,226
2022 count
Owner
State
State Highway Agency

About this bridge

I10 SR8 Eastbound over Al & Gc RR is a prestressed concrete stringer/multi-beam or girder carrying I10 SR8 Eastbound over Al & Gc RR in Escambia County, Florida. It was built in 1961, so it is 64 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 31,226 vehicles a day, roughly 13% of them trucks, projected to reach 54,176 by 2044. The structure is 144 ft (43.9 m) long and 51 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesI10 SR8 Eastbound
CrossesAl & Gc RR
Location0.1 Miles West of US29
RouteInterstate 10
StateFlorida
Coordinates30.50291, -87.2689
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66.6 US tons
Inventory rating50.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length144 ft (43.9 m)
Longest span48 ft (14.6 m)
Deck width51 ft (15.6 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic31,226 (2022)
Projected traffic54,176 by 2044
Trucks13%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesRailroad
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I10 SR8 Eastbound over Al & Gc RR built?

It was built in 1961, making it 64 years old in 2025.

What condition is I10 SR8 Eastbound over Al & Gc RR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does I10 SR8 Eastbound over Al & Gc RR carry?

About 31,226 vehicles per day (2022 count), of which roughly 13% are trucks.

How long is I10 SR8 Eastbound over Al & Gc RR?

The structure is 144 ft (43.9 m) long with a longest span of 48 ft (14.6 m) and a deck 51 ft wide.

Who owns I10 SR8 Eastbound over Al & Gc RR?

It is owned by the State Highway Agency.