I-295 SB Cd Ramp over Csxrr/Us 17
GoodDuval County, Florida · I295 SB Cd RMP/US17&CSXRR · Structure no. 720837
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 281 ft
- 2 main spans
- Daily traffic
- 2,201
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-295 SB Cd Ramp over Csxrr/Us 17 is a prestressed concrete stringer/multi-beam or girder carrying I-295 SB Cd Ramp over Csxrr/Us 17 in Duval County, Florida. It was built in 2023, so it is 2 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,201 vehicles a day, roughly 4% of them trucks, projected to reach 3,821 by 2046. The structure is 281 ft (85.5 m) long and 43 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-295 SB Cd Ramp over Csxrr/Us 17 built?
It was built in 2023, making it 2 years old in 2025.
What condition is I-295 SB Cd Ramp over Csxrr/Us 17 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does I-295 SB Cd Ramp over Csxrr/Us 17 carry?
About 2,201 vehicles per day (2024 count), of which roughly 4% are trucks.
How long is I-295 SB Cd Ramp over Csxrr/Us 17?
The structure is 281 ft (85.5 m) long with a longest span of 148 ft (45.1 m) and a deck 43 ft wide.
Who owns I-295 SB Cd Ramp over Csxrr/Us 17?
It is owned by the State Highway Agency.