I-295 NB Cd over Ramp En
GoodDuval County, Florida · I-295 NB Cd over Ramp En · Structure no. 720852
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 78 ft
- 1 main span
- Daily traffic
- 18,430
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-295 NB Cd over Ramp En is a prestressed concrete stringer/multi-beam or girder carrying I-295 NB Cd over Ramp En in Duval County, Florida. It was built in 2023, so it is 2 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 18,430 vehicles a day, roughly 6% of them trucks, projected to reach 27,230 by 2042. The structure is 78 ft (23.7 m) long and 43 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-295 NB Cd over Ramp En built?
It was built in 2023, making it 2 years old in 2025.
What condition is I-295 NB Cd over Ramp En in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does I-295 NB Cd over Ramp En carry?
About 18,430 vehicles per day (2023 count), of which roughly 6% are trucks.
How long is I-295 NB Cd over Ramp En?
The structure is 78 ft (23.7 m) long with a longest span of 78 ft (23.7 m) and a deck 43 ft wide.
Who owns I-295 NB Cd over Ramp En?
It is owned by the State Highway Agency.