US Bridges

I-295 SB over I-95 (SR-9)

Good

Duval County, Florida · I-295 SB over I-95 · Structure no. 720839

Built
2023
2 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
255 ft
2 main spans
Daily traffic
35,250
2022 count
Owner
State
State Highway Agency

About this bridge

I-295 SB over I-95 (SR-9) is a prestressed concrete stringer/multi-beam or girder carrying I-295 SB over I-95 (SR-9) in Duval County, Florida. It was built in 2023, so it is 2 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 35,250 vehicles a day, roughly 13% of them trucks, projected to reach 61,159 by 2042. The structure is 255 ft (77.8 m) long and 51 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-295 SB
CrossesI-95 (SR-9)
LocationI-295 SB over I-95
RouteInterstate 295
StateFlorida
Coordinates30.45887, -81.65055
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure9 ExcellentNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating72.4 US tons
Inventory rating51.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length255 ft (77.8 m)
Longest span128 ft (38.9 m)
Deck width51 ft (15.6 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic35,250 (2022)
Projected traffic61,159 by 2042
Trucks13%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-295 SB over I-95 (SR-9) built?

It was built in 2023, making it 2 years old in 2025.

What condition is I-295 SB over I-95 (SR-9) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does I-295 SB over I-95 (SR-9) carry?

About 35,250 vehicles per day (2022 count), of which roughly 13% are trucks.

How long is I-295 SB over I-95 (SR-9)?

The structure is 255 ft (77.8 m) long with a longest span of 128 ft (38.9 m) and a deck 51 ft wide.

Who owns I-295 SB over I-95 (SR-9)?

It is owned by the State Highway Agency.