Duval County, Florida · I-10 Eb/Forest ST/I-95 NB · Structure no. 720644

Built
2010
15 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
1,425 ft
9 main spans
Daily traffic
21,500
2023 count
Owner
State
State Highway Agency

About this bridge

I-10 EB to Forest over I-95 NB & SB & I-10 EB is a steel continuous stringer/multi-beam or girder carrying I-10 EB to Forest over I-95 NB & SB & I-10 EB in Duval County, Florida. It was built in 2010, so it is 15 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 21,500 vehicles a day, roughly 4% of them trucks, projected to reach 37,195 by 2045. The structure is 1,425 ft (434.3 m) long and 80 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI-10 EB to Forest
CrossesI-95 NB & SB & I-10 EB
LocationI-10 Eb/Forest ST/I-95 NB
RouteInterstate 10
StateFlorida
Coordinates30.32086, -81.68164
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans9
Design loadHS 20
Structure length1,425 ft (434.3 m)
Longest span245 ft (74.7 m)
Deck width80 ft (24.4 m)
Roadway width68 ft (20.7 m)
Vertical clearance over deck18 ft (5.6 m)

Traffic and service

Average daily traffic21,500 (2023)
Projected traffic37,195 by 2045
Trucks4%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-10 EB to Forest over I-95 NB & SB & I-10 EB built?

It was built in 2010, making it 15 years old in 2025.

What condition is I-10 EB to Forest over I-95 NB & SB & I-10 EB in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does I-10 EB to Forest over I-95 NB & SB & I-10 EB carry?

About 21,500 vehicles per day (2023 count), of which roughly 4% are trucks.

How long is I-10 EB to Forest over I-95 NB & SB & I-10 EB?

The structure is 1,425 ft (434.3 m) long with a longest span of 245 ft (74.7 m) and a deck 80 ft wide.

Who owns I-10 EB to Forest over I-95 NB & SB & I-10 EB?

It is owned by the State Highway Agency.