US Bridges

I-95 SB over Ramp from Forest ST

Good

Duval County, Florida · I-95 SB/I-10 WB · Structure no. 720649

Built
2009
16 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
422 ft
3 main spans
Daily traffic
850
2023 count
Owner
State
State Highway Agency

About this bridge

I-95 SB over Ramp from Forest ST is a steel continuous stringer/multi-beam or girder carrying I-95 SB over Ramp from Forest ST in Duval County, Florida. It was built in 2009, so it is 16 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 850 vehicles a day, roughly 14% of them trucks, projected to reach 1,470 by 2045. The structure is 422 ft (128.6 m) long and 31 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesI-95 SB
CrossesRamp from Forest ST
LocationI-95 SB/I-10 WB
RouteInterstate 95
StateFlorida
Coordinates30.32288, -81.68151
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.7 US tons
Inventory rating38.3 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length422 ft (128.6 m)
Longest span168 ft (51.2 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic850 (2023)
Projected traffic1,470 by 2045
Trucks14%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-95 SB over Ramp from Forest ST built?

It was built in 2009, making it 16 years old in 2025.

What condition is I-95 SB over Ramp from Forest ST in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does I-95 SB over Ramp from Forest ST carry?

About 850 vehicles per day (2023 count), of which roughly 14% are trucks.

How long is I-95 SB over Ramp from Forest ST?

The structure is 422 ft (128.6 m) long with a longest span of 168 ft (51.2 m) and a deck 31 ft wide.

Who owns I-95 SB over Ramp from Forest ST?

It is owned by the State Highway Agency.