US Bridges

Greenland Rd. over I-95 (SR-9)

Good

Duval County, Florida · Greenland Rd. / I-95 · Structure no. 720642

Built
2004
21 years old
Condition
Good
inspected January 2024
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete
Length
413 ft
4 main spans
Daily traffic
19,200
2022 count
Owner
State
State Highway Agency

About this bridge

Greenland Rd. over I-95 (SR-9) is a prestressed concrete box beam or girders - single or spread carrying Greenland Rd. over I-95 (SR-9) in Duval County, Florida. It was built in 2004, so it is 21 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 19,200 vehicles a day, roughly 2% of them trucks, projected to reach 33,312 by 2044. The structure is 413 ft (125.8 m) long and 87 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesGreenland Rd.
CrossesI-95 (SR-9)
LocationGreenland Rd. / I-95
RouteCounty Highway 0
StateFlorida
Coordinates30.16183, -81.5522
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating92.7 US tons
Inventory rating55.6 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length413 ft (125.8 m)
Longest span118 ft (36.1 m)
Deck width87 ft (26.4 m)
Roadway width70 ft (21.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic19,200 (2022)
Projected traffic33,312 by 2044
Trucks2%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Greenland Rd. over I-95 (SR-9) built?

It was built in 2004, making it 21 years old in 2025.

What condition is Greenland Rd. over I-95 (SR-9) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does Greenland Rd. over I-95 (SR-9) carry?

About 19,200 vehicles per day (2022 count), of which roughly 2% are trucks.

How long is Greenland Rd. over I-95 (SR-9)?

The structure is 413 ft (125.8 m) long with a longest span of 118 ft (36.1 m) and a deck 87 ft wide.

Who owns Greenland Rd. over I-95 (SR-9)?

It is owned by the State Highway Agency.