I-295 (SR-9A) SB over Sweetwater Creek
FairDuval County, Florida · I-295 SB to I-95 SB · Structure no. 720736
- Built
- 2005
- 20 years old
- Condition
- Fair
- inspected February 2024
- Type
- Culvert
- Concrete
- Length
- 55 ft
- 4 main spans
- Daily traffic
- 19,500
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
I-295 (SR-9A) SB over Sweetwater Creek is a concrete culvert carrying I-295 (SR-9A) SB over Sweetwater Creek in Duval County, Florida. It was built in 2005, so it is 20 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 19,500 vehicles a day, roughly 13% of them trucks, projected to reach 33,832 by 2044. The structure is 55 ft (16.7 m) long. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
| Culvert | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-295 (SR-9A) SB over Sweetwater Creek built?
It was built in 2005, making it 20 years old in 2025.
What condition is I-295 (SR-9A) SB over Sweetwater Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does I-295 (SR-9A) SB over Sweetwater Creek carry?
About 19,500 vehicles per day (2022 count), of which roughly 13% are trucks.
How long is I-295 (SR-9A) SB over Sweetwater Creek?
The structure is 55 ft (16.7 m) long with a longest span of 10 ft (3 m).
Who owns I-295 (SR-9A) SB over Sweetwater Creek?
It is owned by the State Highway Agency.