US Bridges

I-95NB to I-295NB over I-95 & I-295

Good

Duval County, Florida · I-95 NB to I-295NB · Structure no. 720640

Built
2005
20 years old
Condition
Good
inspected January 2024
Type
Segmental Box Girder
Prestressed Concrete Continuous
Length
2,570 ft
13 main spans
Daily traffic
19,500
2022 count
Owner
State
State Highway Agency

About this bridge

I-95NB to I-295NB over I-95 & I-295 is a prestressed concrete continuous segmental box girder carrying I-95NB to I-295NB over I-95 & I-295 in Duval County, Florida. It was built in 2005, so it is 20 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 19,500 vehicles a day, roughly 13% of them trucks, projected to reach 33,832 by 2044. The structure is 2,570 ft (783.3 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-95NB to I-295NB
CrossesI-95 & I-295
LocationI-95 NB to I-295NB
RouteInterstate 95
StateFlorida
Coordinates30.16715, -81.55562
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating40 US tons
Inventory rating25.9 US tons

Structure

Structure typeSegmental Box Girder
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans13
Design loadHS 20 + Mod
Structure length2,570 ft (783.3 m)
Longest span248 ft (75.6 m)
Deck width43 ft (13 m)
Roadway width41 ft (12.4 m)
Vertical clearance over deck18 ft (5.4 m)

Traffic and service

Average daily traffic19,500 (2022)
Projected traffic33,832 by 2044
Trucks13%
Lanes on structure1
Traffic directionOne-way traffic
CarriesThird level (interchange)
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-95NB to I-295NB over I-95 & I-295 built?

It was built in 2005, making it 20 years old in 2025.

What condition is I-95NB to I-295NB over I-95 & I-295 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does I-95NB to I-295NB over I-95 & I-295 carry?

About 19,500 vehicles per day (2022 count), of which roughly 13% are trucks.

How long is I-95NB to I-295NB over I-95 & I-295?

The structure is 2,570 ft (783.3 m) long with a longest span of 248 ft (75.6 m) and a deck 43 ft wide.

Who owns I-95NB to I-295NB over I-95 & I-295?

It is owned by the State Highway Agency.