US Bridges

I-95 NB Off Ramp over Riverside Ave.

Good

Duval County, Florida · I-95NB Ramp to Park ST · Structure no. 720631

Built
2003
22 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
423 ft
3 main spans
Daily traffic
9,000
2022 count
Owner
State
State Highway Agency

About this bridge

I-95 NB Off Ramp over Riverside Ave. is a prestressed concrete stringer/multi-beam or girder carrying I-95 NB Off Ramp over Riverside Ave. in Duval County, Florida. It was built in 2003, so it is 22 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,000 vehicles a day, roughly 8% of them trucks, projected to reach 15,615 by 2044. The structure is 423 ft (129 m) long and 34 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesI-95 NB Off Ramp
CrossesRiverside Ave.
LocationI-95NB Ramp to Park ST
RouteInterstate 95
StateFlorida
Coordinates30.31713, -81.67644
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating94 US tons
Inventory rating57 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length423 ft (129 m)
Longest span141 ft (43 m)
Deck width34 ft (10.5 m)
Roadway width31 ft (9.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,000 (2022)
Projected traffic15,615 by 2044
Trucks8%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-95 NB Off Ramp over Riverside Ave. built?

It was built in 2003, making it 22 years old in 2025.

What condition is I-95 NB Off Ramp over Riverside Ave. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does I-95 NB Off Ramp over Riverside Ave. carry?

About 9,000 vehicles per day (2022 count), of which roughly 8% are trucks.

How long is I-95 NB Off Ramp over Riverside Ave.?

The structure is 423 ft (129 m) long with a longest span of 141 ft (43 m) and a deck 34 ft wide.

Who owns I-95 NB Off Ramp over Riverside Ave.?

It is owned by the State Highway Agency.