I-295 (SR-9A) SB over Terrapin Creek
GoodDuval County, Florida · I-295 (SR9A)/TERRAPIN Crk · Structure no. 720475
- Built
- 1993
- 32 years old
- Condition
- Good
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 400 ft
- 5 main spans
- Daily traffic
- 34,250
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-295 (SR-9A) SB over Terrapin Creek is a prestressed concrete stringer/multi-beam or girder carrying I-295 (SR-9A) SB over Terrapin Creek in Duval County, Florida. It was built in 1993, so it is 32 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 34,250 vehicles a day, roughly 14% of them trucks, projected to reach 59,424 by 2045. The structure is 400 ft (121.9 m) long and 51 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-295 (SR-9A) SB over Terrapin Creek built?
It was built in 1993, making it 32 years old in 2025.
What condition is I-295 (SR-9A) SB over Terrapin Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does I-295 (SR-9A) SB over Terrapin Creek carry?
About 34,250 vehicles per day (2023 count), of which roughly 14% are trucks.
How long is I-295 (SR-9A) SB over Terrapin Creek?
The structure is 400 ft (121.9 m) long with a longest span of 80 ft (24.4 m) and a deck 51 ft wide.
Who owns I-295 (SR-9A) SB over Terrapin Creek?
It is owned by the State Highway Agency.