CR886(GLDN Gt Pky) over I-75 and Canal C-1
GoodCollier County, Florida · 3.4MI West of SR-951 · Structure no. 030199
- Built
- 1984
- 41 years old, rebuilt 2006
- Condition
- Good
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 588 ft
- 7 main spans
- Daily traffic
- 52,000
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
CR886(GLDN Gt Pky) over I-75 and Canal C-1 is a prestressed concrete stringer/multi-beam or girder carrying CR886(GLDN Gt Pky) over I-75 and Canal C-1 in Collier County, Florida. It was built in 1984 and reconstructed in 2006, so it is 41 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 52,000 vehicles a day, roughly 5% of them trucks, projected to reach 90,220 by 2044. The structure is 588 ft (179.2 m) long and 135 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR886(GLDN Gt Pky) over I-75 and Canal C-1 built?
It was built in 1984, making it 41 years old in 2025. It was reconstructed in 2006.
What condition is CR886(GLDN Gt Pky) over I-75 and Canal C-1 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does CR886(GLDN Gt Pky) over I-75 and Canal C-1 carry?
About 52,000 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is CR886(GLDN Gt Pky) over I-75 and Canal C-1?
The structure is 588 ft (179.2 m) long with a longest span of 109 ft (33.2 m) and a deck 135 ft wide.
Who owns CR886(GLDN Gt Pky) over I-75 and Canal C-1?
It is owned by the State Highway Agency.