I-75 SB (SR-93) over Golden Gate Canal
GoodCollier County, Florida · 0.5 MI South of CR-886 · Structure no. 030197
- Built
- 1984
- 41 years old, rebuilt 2016
- Condition
- Good
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 223 ft
- 5 main spans
- Daily traffic
- 45,500
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-75 SB (SR-93) over Golden Gate Canal is a prestressed concrete stringer/multi-beam or girder carrying I-75 SB (SR-93) over Golden Gate Canal in Collier County, Florida. It was built in 1984 and reconstructed in 2016, so it is 41 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 45,500 vehicles a day, roughly 14% of them trucks, projected to reach 79,029 by 2042. The structure is 223 ft (67.9 m) long and 59 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-75 SB (SR-93) over Golden Gate Canal built?
It was built in 1984, making it 41 years old in 2025. It was reconstructed in 2016.
What condition is I-75 SB (SR-93) over Golden Gate Canal in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does I-75 SB (SR-93) over Golden Gate Canal carry?
About 45,500 vehicles per day (2023 count), of which roughly 14% are trucks.
How long is I-75 SB (SR-93) over Golden Gate Canal?
The structure is 223 ft (67.9 m) long with a longest span of 46 ft (13.9 m) and a deck 59 ft wide.
Who owns I-75 SB (SR-93) over Golden Gate Canal?
It is owned by the State Highway Agency.