US Bridges

869 SB to I-75 SB over SR-93(I-75) NB

Fair

Broward County, Florida · I-595/I-75 Interchange · Structure no. 860515

Built
1988
37 years old
Condition
Fair
inspected August 2023
Type
Segmental Box Girder
Prestressed Concrete Continuous
Length
414 ft
3 main spans
Daily traffic
27,500
2023 count
Owner
State
State Highway Agency

About this bridge

869 SB to I-75 SB over SR-93(I-75) NB is a prestressed concrete continuous segmental box girder carrying 869 SB to I-75 SB over SR-93(I-75) NB in Broward County, Florida. It was built in 1988, so it is 37 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 27,500 vehicles a day, roughly 6% of them trucks, projected to reach 47,712 by 2042. The structure is 414 ft (126.2 m) long and 59 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

Carries869 SB to I-75 SB
CrossesSR-93(I-75) NB
LocationI-595/I-75 Interchange
RouteInterstate 75
StateFlorida
Coordinates26.11712, -80.34895
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55.8 US tons
Inventory rating36 US tons

Structure

Structure typeSegmental Box Girder
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length414 ft (126.2 m)
Longest span183 ft (55.8 m)
Deck width59 ft (17.9 m)
Roadway width56 ft (17.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic27,500 (2023)
Projected traffic47,712 by 2042
Trucks6%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 869 SB to I-75 SB over SR-93(I-75) NB built?

It was built in 1988, making it 37 years old in 2025.

What condition is 869 SB to I-75 SB over SR-93(I-75) NB in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does 869 SB to I-75 SB over SR-93(I-75) NB carry?

About 27,500 vehicles per day (2023 count), of which roughly 6% are trucks.

How long is 869 SB to I-75 SB over SR-93(I-75) NB?

The structure is 414 ft (126.2 m) long with a longest span of 183 ft (55.8 m) and a deck 59 ft wide.

Who owns 869 SB to I-75 SB over SR-93(I-75) NB?

It is owned by the State Highway Agency.