US Bridges

SR-222(NW 39th Av) over I-75 (SR-93)

Good

Alachua County, Florida · SR-222 over I-75 · Structure no. 260101

Built
2001
24 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
383 ft
4 main spans
Daily traffic
31,500
2023 count
Owner
State
State Highway Agency

About this bridge

SR-222(NW 39th Av) over I-75 (SR-93) is a prestressed concrete stringer/multi-beam or girder carrying SR-222(NW 39th Av) over I-75 (SR-93) in Alachua County, Florida. It was built in 2001, so it is 24 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 31,500 vehicles a day, roughly 3% of them trucks, projected to reach 54,653 by 2045. The structure is 383 ft (116.8 m) long and 109 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesSR-222(NW 39th Av)
CrossesI-75 (SR-93)
LocationSR-222 over I-75
RouteState Highway 222
StateFlorida
Coordinates29.68889, -82.44639
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating72.8 US tons
Inventory rating43.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length383 ft (116.8 m)
Longest span126 ft (38.3 m)
Deck width109 ft (33.3 m)
Roadway width84 ft (25.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic31,500 (2023)
Projected traffic54,653 by 2045
Trucks3%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-222(NW 39th Av) over I-75 (SR-93) built?

It was built in 2001, making it 24 years old in 2025.

What condition is SR-222(NW 39th Av) over I-75 (SR-93) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does SR-222(NW 39th Av) over I-75 (SR-93) carry?

About 31,500 vehicles per day (2023 count), of which roughly 3% are trucks.

How long is SR-222(NW 39th Av) over I-75 (SR-93)?

The structure is 383 ft (116.8 m) long with a longest span of 126 ft (38.3 m) and a deck 109 ft wide.

Who owns SR-222(NW 39th Av) over I-75 (SR-93)?

It is owned by the State Highway Agency.