US Bridges

CR-2074 (sw 20th) over I-75 (SR-93)

Fair

Alachua County, Florida · 1.9 MI N. of SR-24 · Structure no. 260056

Built
1964
61 years old, rebuilt 1999
Condition
Fair
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
266 ft
4 main spans
Daily traffic
17,500
2022 count
Owner
State
State Highway Agency

About this bridge

CR-2074 (sw 20th) over I-75 (SR-93) is a prestressed concrete stringer/multi-beam or girder carrying CR-2074 (sw 20th) over I-75 (SR-93) in Alachua County, Florida. It was built in 1964 and reconstructed in 1999, so it is 61 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 17,500 vehicles a day, roughly 3% of them trucks, projected to reach 30,362 by 2044. The structure is 266 ft (81.1 m) long and 47 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCR-2074 (sw 20th)
CrossesI-75 (SR-93)
Location1.9 MI N. of SR-24
RouteCounty Highway 2074
StateFlorida
Coordinates29.63994, -82.40204
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71.1 US tons
Inventory rating42.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length266 ft (81.1 m)
Longest span86 ft (26.2 m)
Deck width47 ft (14.2 m)
Roadway width43 ft (13.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,500 (2022)
Projected traffic30,362 by 2044
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was CR-2074 (sw 20th) over I-75 (SR-93) built?

It was built in 1964, making it 61 years old in 2025. It was reconstructed in 1999.

What condition is CR-2074 (sw 20th) over I-75 (SR-93) in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does CR-2074 (sw 20th) over I-75 (SR-93) carry?

About 17,500 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is CR-2074 (sw 20th) over I-75 (SR-93)?

The structure is 266 ft (81.1 m) long with a longest span of 86 ft (26.2 m) and a deck 47 ft wide.

Who owns CR-2074 (sw 20th) over I-75 (SR-93)?

It is owned by the State Highway Agency.