CR-2074 (sw 20th) over I-75 (SR-93)
FairAlachua County, Florida · 1.9 MI N. of SR-24 · Structure no. 260056
- Built
- 1964
- 61 years old, rebuilt 1999
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 266 ft
- 4 main spans
- Daily traffic
- 17,500
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
CR-2074 (sw 20th) over I-75 (SR-93) is a prestressed concrete stringer/multi-beam or girder carrying CR-2074 (sw 20th) over I-75 (SR-93) in Alachua County, Florida. It was built in 1964 and reconstructed in 1999, so it is 61 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 17,500 vehicles a day, roughly 3% of them trucks, projected to reach 30,362 by 2044. The structure is 266 ft (81.1 m) long and 47 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR-2074 (sw 20th) over I-75 (SR-93) built?
It was built in 1964, making it 61 years old in 2025. It was reconstructed in 1999.
What condition is CR-2074 (sw 20th) over I-75 (SR-93) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does CR-2074 (sw 20th) over I-75 (SR-93) carry?
About 17,500 vehicles per day (2022 count), of which roughly 3% are trucks.
How long is CR-2074 (sw 20th) over I-75 (SR-93)?
The structure is 266 ft (81.1 m) long with a longest span of 86 ft (26.2 m) and a deck 47 ft wide.
Who owns CR-2074 (sw 20th) over I-75 (SR-93)?
It is owned by the State Highway Agency.