I-75 SB SR-93 over SR-26 Newberry Road
GoodAlachua County, Florida · I-75 SB over SR-26 · Structure no. 260057
- Built
- 1964
- 61 years old, rebuilt 1994
- Condition
- Good
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 257 ft
- 4 main spans
- Daily traffic
- 52,250
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
I-75 SB SR-93 over SR-26 Newberry Road is a prestressed concrete stringer/multi-beam or girder carrying I-75 SB SR-93 over SR-26 Newberry Road in Alachua County, Florida. It was built in 1964 and reconstructed in 1994, so it is 61 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 52,250 vehicles a day, roughly 31% of them trucks, projected to reach 90,654 by 2044. The structure is 257 ft (78.3 m) long and 67 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-75 SB SR-93 over SR-26 Newberry Road built?
It was built in 1964, making it 61 years old in 2025. It was reconstructed in 1994.
What condition is I-75 SB SR-93 over SR-26 Newberry Road in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does I-75 SB SR-93 over SR-26 Newberry Road carry?
About 52,250 vehicles per day (2022 count), of which roughly 31% are trucks.
How long is I-75 SB SR-93 over SR-26 Newberry Road?
The structure is 257 ft (78.3 m) long with a longest span of 67 ft (20.4 m) and a deck 67 ft wide.
Who owns I-75 SB SR-93 over SR-26 Newberry Road?
It is owned by the State Highway Agency.