WB Ridgegate Parkw over Happy Canyon Creek
GoodDouglas County, Colorado · 0.73 MI E of I25 · Structure no. LONE TREE-5
- Built
- 2019
- 6 years old
- Condition
- Good
- inspected January 2025
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete
- Length
- 141 ft
- 1 main span
- Daily traffic
- 17,120
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
WB Ridgegate Parkw over Happy Canyon Creek is a prestressed concrete box beam or girders - single or spread carrying WB Ridgegate Parkw over Happy Canyon Creek in Douglas County, Colorado. It was built in 2019, so it is 6 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 17,120 vehicles a day, roughly 2% of them trucks, projected to reach 22,941 by 2042. The structure is 141 ft (43 m) long and 48 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was WB Ridgegate Parkw over Happy Canyon Creek built?
It was built in 2019, making it 6 years old in 2025.
What condition is WB Ridgegate Parkw over Happy Canyon Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does WB Ridgegate Parkw over Happy Canyon Creek carry?
About 17,120 vehicles per day (2022 count), of which roughly 2% are trucks.
How long is WB Ridgegate Parkw over Happy Canyon Creek?
The structure is 141 ft (43 m) long with a longest span of 135 ft (41.1 m) and a deck 48 ft wide.
Who owns WB Ridgegate Parkw over Happy Canyon Creek?
It is owned by the City or Municipal Highway Agency.