Havana Street over Happy Canyon Creek | Ped
GoodDouglas County, Colorado · 1.3 MI S of Ridgegate · Structure no. LONE TREE-3
- Built
- 2009
- 16 years old
- Condition
- Good
- inspected January 2025
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 120 ft
- 1 main span
- Daily traffic
- 1,145
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Havana Street over Happy Canyon Creek | Ped is a prestressed concrete box beam or girders - multiple carrying Havana Street over Happy Canyon Creek | Ped in Douglas County, Colorado. It was built in 2009, so it is 16 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,145 vehicles a day, roughly 4% of them trucks, projected to reach 1,534 by 2041. The structure is 120 ft (36.6 m) long and 43 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Havana Street over Happy Canyon Creek | Ped built?
It was built in 2009, making it 16 years old in 2025.
What condition is Havana Street over Happy Canyon Creek | Ped in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does Havana Street over Happy Canyon Creek | Ped carry?
About 1,145 vehicles per day (2021 count), of which roughly 4% are trucks.
How long is Havana Street over Happy Canyon Creek | Ped?
The structure is 120 ft (36.6 m) long with a longest span of 115 ft (35.1 m) and a deck 43 ft wide.
Who owns Havana Street over Happy Canyon Creek | Ped?
It is owned by the City or Municipal Highway Agency.