Sky Ridge Avenue over NB I25 Ml | SB I25 Ml
GoodDouglas County, Colorado · 0.4 MI S of Lincoln Ave · Structure no. LONE TREE-4
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 500 ft
- 4 main spans
- Daily traffic
- 4
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Sky Ridge Avenue over NB I25 Ml | SB I25 Ml is a prestressed concrete continuous stringer/multi-beam or girder carrying Sky Ridge Avenue over NB I25 Ml | SB I25 Ml in Douglas County, Colorado. It was built in 2018, so it is 7 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4 vehicles a day, roughly 1% of them trucks, projected to reach 5 by 2041. The structure is 500 ft (152.4 m) long and 67 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sky Ridge Avenue over NB I25 Ml | SB I25 Ml built?
It was built in 2018, making it 7 years old in 2025.
What condition is Sky Ridge Avenue over NB I25 Ml | SB I25 Ml in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does Sky Ridge Avenue over NB I25 Ml | SB I25 Ml carry?
About 4 vehicles per day (2021 count), of which roughly 1% are trucks.
How long is Sky Ridge Avenue over NB I25 Ml | SB I25 Ml?
The structure is 500 ft (152.4 m) long with a longest span of 123 ft (37.6 m) and a deck 67 ft wide.
Who owns Sky Ridge Avenue over NB I25 Ml | SB I25 Ml?
It is owned by the City or Municipal Highway Agency.