I 25 Ml over Rdwy RR South Platte Rvr
GoodDenver County, Colorado · In Denver · Structure no. F-16-XB
- Built
- 2011
- 14 years old
- Condition
- Good
- inspected November 2023
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 371 ft
- 5 main spans
- Daily traffic
- 212,000
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
I 25 Ml over Rdwy RR South Platte Rvr is a prestressed concrete continuous box beam or girders - single or spread carrying I 25 Ml over Rdwy RR South Platte Rvr in Denver County, Colorado. It was built in 2011, so it is 14 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 212,000 vehicles a day, roughly 7% of them trucks, projected to reach 248,040 by 2040. The structure is 371 ft (113.1 m) long and 197 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 25 Ml over Rdwy RR South Platte Rvr built?
It was built in 2011, making it 14 years old in 2025.
What condition is I 25 Ml over Rdwy RR South Platte Rvr in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does I 25 Ml over Rdwy RR South Platte Rvr carry?
About 212,000 vehicles per day (2020 count), of which roughly 7% are trucks.
How long is I 25 Ml over Rdwy RR South Platte Rvr?
The structure is 371 ft (113.1 m) long with a longest span of 125 ft (38.1 m) and a deck 197 ft wide.
Who owns I 25 Ml over Rdwy RR South Platte Rvr?
It is owned by the State Highway Agency.