I 25 Ml over Ramp to I25 SB Walnut ST
FairDenver County, Colorado · I25 SH33 US 40 Intercha · Structure no. F-16-DQ
- Built
- 1952
- 73 years old, rebuilt 1987
- Condition
- Fair
- inspected March 2024
- Type
- Frame
- Concrete
- Length
- 120 ft
- 2 main spans
- Daily traffic
- 212,000
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
I 25 Ml over Ramp to I25 SB Walnut ST is a concrete frame carrying I 25 Ml over Ramp to I25 SB Walnut ST in Denver County, Colorado. It was built in 1952 and reconstructed in 1987, so it is 73 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 212,000 vehicles a day, roughly 7% of them trucks, projected to reach 248,040 by 2040. The structure is 120 ft (36.6 m) long and 149 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 25 Ml over Ramp to I25 SB Walnut ST built?
It was built in 1952, making it 73 years old in 2025. It was reconstructed in 1987.
What condition is I 25 Ml over Ramp to I25 SB Walnut ST in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does I 25 Ml over Ramp to I25 SB Walnut ST carry?
About 212,000 vehicles per day (2020 count), of which roughly 7% are trucks.
How long is I 25 Ml over Ramp to I25 SB Walnut ST?
The structure is 120 ft (36.6 m) long with a longest span of 59 ft (18 m) and a deck 149 ft wide.
Who owns I 25 Ml over Ramp to I25 SB Walnut ST?
It is owned by the State Highway Agency.