Auraria Pkwy Ramp over I25 Ramps and Walnut
FairDenver County, Colorado · Ramp over I25 to SB I25 · Structure no. F-16-NX
- Built
- 1987
- 38 years old
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 587 ft
- 4 main spans
- Daily traffic
- 15,048
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Auraria Pkwy Ramp over I25 Ramps and Walnut is a steel continuous stringer/multi-beam or girder carrying Auraria Pkwy Ramp over I25 Ramps and Walnut in Denver County, Colorado. It was built in 1987, so it is 38 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,048 vehicles a day, roughly 7% of them trucks, projected to reach 16,703 by 2044. The structure is 587 ft (178.9 m) long and 38 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Auraria Pkwy Ramp over I25 Ramps and Walnut built?
It was built in 1987, making it 38 years old in 2025.
What condition is Auraria Pkwy Ramp over I25 Ramps and Walnut in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Auraria Pkwy Ramp over I25 Ramps and Walnut carry?
About 15,048 vehicles per day (2024 count), of which roughly 7% are trucks.
How long is Auraria Pkwy Ramp over I25 Ramps and Walnut?
The structure is 587 ft (178.9 m) long with a longest span of 205 ft (62.5 m) and a deck 38 ft wide.
Who owns Auraria Pkwy Ramp over I25 Ramps and Walnut?
It is owned by the State Highway Agency.