Gilbert Road over T.I.D. Ceres Main Canal

Good

Stanislaus County, California · At Hatch Road · Structure no. 38C0348

Built
2021
4 years old
Condition
Good
inspected November 2022
Type
Culvert
Concrete Continuous
Length
50 ft
2 main spans
Daily traffic
420
2011 count
Owner
County
County Highway Agency

About this bridge

Gilbert Road over T.I.D. Ceres Main Canal is a concrete continuous culvert carrying Gilbert Road over T.I.D. Ceres Main Canal in Stanislaus County, California. It was built in 2021, so it is 4 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 420 vehicles a day, roughly 3% of them trucks, projected to reach 577 by 2043. The structure is 50 ft (15.2 m) long and 35 ft wide.

CarriesGilbert Road
CrossesT.I.D. Ceres Main Canal
LocationAt Hatch Road
RouteCounty Highway 0
Coordinates37.60905, -120.9155
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionNovember 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadGreater than HL 93
Structure length50 ft (15.2 m)
Longest span25 ft (7.5 m)
Deck width35 ft (10.6 m)
Roadway width31 ft (9.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic420 (2011)
Projected traffic577 by 2043
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Gilbert Road over T.I.D. Ceres Main Canal built?

It was built in 2021, making it 4 years old in 2025.

What condition is Gilbert Road over T.I.D. Ceres Main Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2022.

How much traffic does Gilbert Road over T.I.D. Ceres Main Canal carry?

About 420 vehicles per day (2011 count), of which roughly 3% are trucks.

How long is Gilbert Road over T.I.D. Ceres Main Canal?

The structure is 50 ft (15.2 m) long with a longest span of 25 ft (7.5 m) and a deck 35 ft wide.

Who owns Gilbert Road over T.I.D. Ceres Main Canal?

It is owned by the County Highway Agency.