Hatch Road over Ceres Main Spwy
FairStanislaus County, California · W/O Faith Home Road · Structure no. 38C0125
- Built
- 1916
- 109 years old, rebuilt 2007
- Condition
- Fair
- inspected November 2024
- Type
- Slab
- Concrete
- Length
- 22 ft
- 2 main spans
- Daily traffic
- 11,486
- 2016 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Hatch Road over Ceres Main Spwy is a concrete slab carrying Hatch Road over Ceres Main Spwy in Stanislaus County, California. It was built in 1916 and reconstructed in 2007, so it is 109 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 11,486 vehicles a day, roughly 11% of them trucks, projected to reach 13,262 by 2042. The structure is 22 ft (6.7 m) long and 89 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Hatch Road over Ceres Main Spwy built?
It was built in 1916, making it 109 years old in 2025. It was reconstructed in 2007.
What condition is Hatch Road over Ceres Main Spwy in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does Hatch Road over Ceres Main Spwy carry?
About 11,486 vehicles per day (2016 count), of which roughly 11% are trucks.
How long is Hatch Road over Ceres Main Spwy?
The structure is 22 ft (6.7 m) long with a longest span of 11 ft (3.4 m) and a deck 89 ft wide.
Who owns Hatch Road over Ceres Main Spwy?
It is owned by the City or Municipal Highway Agency.