Faith Home Road over T.I.D. Ceres Main Canal
FairStanislaus County, California · S/O Hatch RD · Structure no. 38C0149
- Built
- 1991
- 34 years old
- Condition
- Fair
- inspected November 2024
- Type
- Slab
- Concrete Continuous
- Length
- 47 ft
- 2 main spans
- Daily traffic
- 1,800
- 2005 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Faith Home Road over T.I.D. Ceres Main Canal is a concrete continuous slab carrying Faith Home Road over T.I.D. Ceres Main Canal in Stanislaus County, California. It was built in 1991, so it is 34 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,800 vehicles a day, roughly 3% of them trucks, projected to reach 5,453 by 2044. The structure is 47 ft (14.3 m) long and 35 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Faith Home Road over T.I.D. Ceres Main Canal built?
It was built in 1991, making it 34 years old in 2025.
What condition is Faith Home Road over T.I.D. Ceres Main Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does Faith Home Road over T.I.D. Ceres Main Canal carry?
About 1,800 vehicles per day (2005 count), of which roughly 3% are trucks.
How long is Faith Home Road over T.I.D. Ceres Main Canal?
The structure is 47 ft (14.3 m) long with a longest span of 23 ft (7 m) and a deck 35 ft wide.
Who owns Faith Home Road over T.I.D. Ceres Main Canal?
It is owned by the City or Municipal Highway Agency.