US Bridges

Grossmont Centr DR over Mtdb Lrt & Sdiv RR

Good

San Diego County, California · 160 Ft S/O Fletcher Pkwy · Structure no. 57C0467

Built
1961
64 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
188 ft
2 main spans
Daily traffic
17,750
2016 count
Owner
City
City or Municipal Highway Agency

About this bridge

Grossmont Centr DR over Mtdb Lrt & Sdiv RR is a prestressed concrete stringer/multi-beam or girder carrying Grossmont Centr DR over Mtdb Lrt & Sdiv RR in San Diego County, California. It was built in 1961, so it is 64 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 17,750 vehicles a day, roughly 4% of them trucks, projected to reach 21,448 by 2041. The structure is 188 ft (57.3 m) long and 60 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesGrossmont Centr DR
CrossesMtdb Lrt & Sdiv RR
Location160 Ft S/O Fletcher Pkwy
RouteCity Street 0
Coordinates32.78171, -117.01151
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating22.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length188 ft (57.3 m)
Longest span101 ft (30.8 m)
Deck width60 ft (18.3 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,750 (2016)
Projected traffic21,448 by 2041
Trucks4%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway and railroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Grossmont Centr DR over Mtdb Lrt & Sdiv RR built?

It was built in 1961, making it 64 years old in 2025.

What condition is Grossmont Centr DR over Mtdb Lrt & Sdiv RR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Grossmont Centr DR over Mtdb Lrt & Sdiv RR carry?

About 17,750 vehicles per day (2016 count), of which roughly 4% are trucks.

How long is Grossmont Centr DR over Mtdb Lrt & Sdiv RR?

The structure is 188 ft (57.3 m) long with a longest span of 101 ft (30.8 m) and a deck 60 ft wide.

Who owns Grossmont Centr DR over Mtdb Lrt & Sdiv RR?

It is owned by the City or Municipal Highway Agency.