US Bridges

S125-E&W8 Connectr over Murray Drive

Good

San Diego County, California · 11-SD-125-R15.56-LMSA · Structure no. 57 0971F

Built
1993
32 years old
Condition
Good
inspected August 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
134 ft
1 main span
Daily traffic
2,001
2020 count
Owner
State
State Highway Agency

About this bridge

S125-E&W8 Connectr over Murray Drive is a prestressed concrete box beam or girders - multiple carrying S125-E&W8 Connectr over Murray Drive in San Diego County, California. It was built in 1993, so it is 32 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,001 vehicles a day, roughly 4% of them trucks, projected to reach 4,303 by 2042. The structure is 134 ft (40.8 m) long and 49 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesS125-E&W8 Connectr
CrossesMurray Drive
Location11-SD-125-R15.56-LMSA
RouteState Highway 125
Coordinates32.77973, -117.00481
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length134 ft (40.8 m)
Longest span131 ft (39.9 m)
Deck width49 ft (14.9 m)
Roadway width46 ft (13.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,001 (2020)
Projected traffic4,303 by 2042
Trucks4%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was S125-E&W8 Connectr over Murray Drive built?

It was built in 1993, making it 32 years old in 2025.

What condition is S125-E&W8 Connectr over Murray Drive in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does S125-E&W8 Connectr over Murray Drive carry?

About 2,001 vehicles per day (2020 count), of which roughly 4% are trucks.

How long is S125-E&W8 Connectr over Murray Drive?

The structure is 134 ft (40.8 m) long with a longest span of 131 ft (39.9 m) and a deck 49 ft wide.

Who owns S125-E&W8 Connectr over Murray Drive?

It is owned by the State Highway Agency.