N805-MIRA Mesa Off over Bnsf/Soledad Cr/City ST
FairSan Diego County, California · 11-SD-805-26.75-SD · Structure no. 57 0787S
- Built
- 1972
- 53 years old
- Condition
- Fair
- inspected October 2024
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 937 ft
- 8 main spans
- Daily traffic
- 17,900
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
N805-MIRA Mesa Off over Bnsf/Soledad Cr/City ST is a concrete continuous box beam or girders - multiple carrying N805-MIRA Mesa Off over Bnsf/Soledad Cr/City ST in San Diego County, California. It was built in 1972, so it is 53 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 17,900 vehicles a day, roughly 4% of them trucks, projected to reach 30,809 by 2042. The structure is 937 ft (285.6 m) long and 34 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was N805-MIRA Mesa Off over Bnsf/Soledad Cr/City ST built?
It was built in 1972, making it 53 years old in 2025.
What condition is N805-MIRA Mesa Off over Bnsf/Soledad Cr/City ST in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does N805-MIRA Mesa Off over Bnsf/Soledad Cr/City ST carry?
About 17,900 vehicles per day (2020 count), of which roughly 4% are trucks.
How long is N805-MIRA Mesa Off over Bnsf/Soledad Cr/City ST?
The structure is 937 ft (285.6 m) long with a longest span of 132 ft (40.2 m) and a deck 34 ft wide.
Who owns N805-MIRA Mesa Off over Bnsf/Soledad Cr/City ST?
It is owned by the State Highway Agency.