Interstate 805 NB over Bnsf/Soledad Cr/City ST
FairSan Diego County, California · 11-SD-805-26.76-SD · Structure no. 57 0787R
- Built
- 1972
- 53 years old, rebuilt 2016
- Condition
- Fair
- inspected October 2024
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 847 ft
- 6 main spans
- Daily traffic
- 93,000
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Interstate 805 NB over Bnsf/Soledad Cr/City ST is a concrete continuous box beam or girders - multiple carrying Interstate 805 NB over Bnsf/Soledad Cr/City ST in San Diego County, California. It was built in 1972 and reconstructed in 2016, so it is 53 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 93,000 vehicles a day, roughly 8% of them trucks, projected to reach 122,500 by 2042. The structure is 847 ft (258.2 m) long and 103 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Interstate 805 NB over Bnsf/Soledad Cr/City ST built?
It was built in 1972, making it 53 years old in 2025. It was reconstructed in 2016.
What condition is Interstate 805 NB over Bnsf/Soledad Cr/City ST in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Interstate 805 NB over Bnsf/Soledad Cr/City ST carry?
About 93,000 vehicles per day (2020 count), of which roughly 8% are trucks.
How long is Interstate 805 NB over Bnsf/Soledad Cr/City ST?
The structure is 847 ft (258.2 m) long with a longest span of 155 ft (47.2 m) and a deck 103 ft wide.
Who owns Interstate 805 NB over Bnsf/Soledad Cr/City ST?
It is owned by the State Highway Agency.