US Bridges

N805-MIRA Mesa Off over Mira Mesa Blvd

Fair

San Diego County, California · 11-SD-805-27.07 · Structure no. 57 0785S

Built
1994
31 years old
Condition
Fair
inspected October 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
166 ft
1 main span
Daily traffic
17,000
2020 count
Owner
State
State Highway Agency

About this bridge

N805-MIRA Mesa Off over Mira Mesa Blvd is a prestressed concrete box beam or girders - multiple carrying N805-MIRA Mesa Off over Mira Mesa Blvd in San Diego County, California. It was built in 1994, so it is 31 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 17,000 vehicles a day, roughly 7% of them trucks, projected to reach 18,000 by 2042. The structure is 166 ft (50.6 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesN805-MIRA Mesa Off
CrossesMira Mesa Blvd
Location11-SD-805-27.07
RouteInterstate 805
Coordinates32.8908, -117.20581
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58.5 US tons
Inventory rating32.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length166 ft (50.6 m)
Longest span165 ft (50.3 m)
Deck width36 ft (10.9 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,000 (2020)
Projected traffic18,000 by 2042
Trucks7%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was N805-MIRA Mesa Off over Mira Mesa Blvd built?

It was built in 1994, making it 31 years old in 2025.

What condition is N805-MIRA Mesa Off over Mira Mesa Blvd in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does N805-MIRA Mesa Off over Mira Mesa Blvd carry?

About 17,000 vehicles per day (2020 count), of which roughly 7% are trucks.

How long is N805-MIRA Mesa Off over Mira Mesa Blvd?

The structure is 166 ft (50.6 m) long with a longest span of 165 ft (50.3 m) and a deck 36 ft wide.

Who owns N805-MIRA Mesa Off over Mira Mesa Blvd?

It is owned by the State Highway Agency.