US Bridges

2nd Street over Warm Creek

Good

San Bernardino County, California · 300 Ft E/O Arrowhead Ave · Structure no. 54C0803

Built
2022
3 years old
Condition
Good
inspected February 2024
Type
Slab
Prestressed Concrete
Length
56 ft
1 main span
Daily traffic
8,055
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

2nd Street over Warm Creek is a prestressed concrete slab carrying 2nd Street over Warm Creek in San Bernardino County, California. It was built in 2022, so it is 3 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,055 vehicles a day, roughly 1% of them trucks, projected to reach 10,000 by 2046. The structure is 56 ft (17.1 m) long and 82 ft wide.

Carries2nd Street
CrossesWarm Creek
Location300 Ft E/O Arrowhead Ave
RouteCity Street 0
Coordinates34.10281, -117.28853
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadGreater than HL 93
Structure length56 ft (17.1 m)
Longest span51 ft (15.6 m)
Deck width82 ft (25 m)
Roadway width66 ft (20.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,055 (2024)
Projected traffic10,000 by 2046
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 2nd Street over Warm Creek built?

It was built in 2022, making it 3 years old in 2025.

What condition is 2nd Street over Warm Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does 2nd Street over Warm Creek carry?

About 8,055 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is 2nd Street over Warm Creek?

The structure is 56 ft (17.1 m) long with a longest span of 51 ft (15.6 m) and a deck 82 ft wide.

Who owns 2nd Street over Warm Creek?

It is owned by the City or Municipal Highway Agency.