N215-2nd ST Off R over BNSF RY & Metrolink
FairSan Bernardino County, California · 08-SBD-215-6.60-SBD · Structure no. 54 1254S
- Built
- 2013
- 12 years old
- Condition
- Fair
- inspected February 2024
- Type
- Slab
- Concrete
- Length
- 110 ft
- 3 main spans
- Daily traffic
- 1,001
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
N215-2nd ST Off R over BNSF RY & Metrolink is a concrete slab carrying N215-2nd ST Off R over BNSF RY & Metrolink in San Bernardino County, California. It was built in 2013, so it is 12 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,001 vehicles a day, roughly 2% of them trucks, projected to reach 3,185 by 2044. The structure is 110 ft (33.4 m) long and 42 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was N215-2nd ST Off R over BNSF RY & Metrolink built?
It was built in 2013, making it 12 years old in 2025.
What condition is N215-2nd ST Off R over BNSF RY & Metrolink in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does N215-2nd ST Off R over BNSF RY & Metrolink carry?
About 1,001 vehicles per day (2020 count), of which roughly 2% are trucks.
How long is N215-2nd ST Off R over BNSF RY & Metrolink?
The structure is 110 ft (33.4 m) long with a longest span of 42 ft (12.8 m) and a deck 42 ft wide.
Who owns N215-2nd ST Off R over BNSF RY & Metrolink?
It is owned by the State Highway Agency.