Interstate 215 over BNSF RY & Metrolink
FairSan Bernardino County, California · 08-SBD-215-6.59-SBD · Structure no. 54 0489
- Built
- 1957
- 68 years old, rebuilt 2013
- Condition
- Fair
- inspected February 2024
- Type
- Tee Beam
- Concrete Continuous
- Length
- 114 ft
- 3 main spans
- Daily traffic
- 192,000
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Interstate 215 over BNSF RY & Metrolink is a concrete continuous tee beam carrying Interstate 215 over BNSF RY & Metrolink in San Bernardino County, California. It was built in 1957 and reconstructed in 2013, so it is 68 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 192,000 vehicles a day, roughly 10% of them trucks, projected to reach 213,352 by 2046. The structure is 114 ft (34.7 m) long and 194 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Interstate 215 over BNSF RY & Metrolink built?
It was built in 1957, making it 68 years old in 2025. It was reconstructed in 2013.
What condition is Interstate 215 over BNSF RY & Metrolink in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does Interstate 215 over BNSF RY & Metrolink carry?
About 192,000 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is Interstate 215 over BNSF RY & Metrolink?
The structure is 114 ft (34.7 m) long with a longest span of 45 ft (13.7 m) and a deck 194 ft wide.
Who owns Interstate 215 over BNSF RY & Metrolink?
It is owned by the State Highway Agency.