US Bridges

Lambert Road over Brea Canyon Channel

Poor

Orange County, California · 0.1 Mi. W/O Brea Blvd. · Structure no. 55C0419

Built
1980
45 years old
Condition
Poor
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
65 ft
1 main span
Daily traffic
36,000
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

Lambert Road over Brea Canyon Channel is a prestressed concrete stringer/multi-beam or girder carrying Lambert Road over Brea Canyon Channel in Orange County, California. It was built in 1980, so it is 45 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

It carries about 36,000 vehicles a day, roughly 7% of them trucks, projected to reach 55,000 by 2041. The structure is 65 ft (19.8 m) long and 100 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesLambert Road
CrossesBrea Canyon Channel
Location0.1 Mi. W/O Brea Blvd.
RouteCity Street 0
Coordinates33.92465, -117.90017
Functional classUrban Other Principal Arterial

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck4 PoorAdvanced section loss, deterioration, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71.4 US tons
Inventory rating51.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length65 ft (19.8 m)
Longest span62 ft (18.9 m)
Deck width100 ft (30.5 m)
Roadway width84 ft (25.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic36,000 (2017)
Projected traffic55,000 by 2041
Trucks7%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Lambert Road over Brea Canyon Channel built?

It was built in 1980, making it 45 years old in 2025.

What condition is Lambert Road over Brea Canyon Channel in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in June 2023.

How much traffic does Lambert Road over Brea Canyon Channel carry?

About 36,000 vehicles per day (2017 count), of which roughly 7% are trucks.

How long is Lambert Road over Brea Canyon Channel?

The structure is 65 ft (19.8 m) long with a longest span of 62 ft (18.9 m) and a deck 100 ft wide.

Who owns Lambert Road over Brea Canyon Channel?

It is owned by the City or Municipal Highway Agency.