Brea Canyon Blvd. over Brea Canyon Channel
FairOrange County, California · 0.4 MI N/O Central Avenue · Structure no. 55C0121
- Built
- 1929
- 96 years old, rebuilt 1938
- Condition
- Fair
- inspected May 2024
- Type
- Slab
- Concrete
- Length
- 30 ft
- 2 main spans
- Daily traffic
- 20,709
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
Brea Canyon Blvd. over Brea Canyon Channel is a concrete slab carrying Brea Canyon Blvd. over Brea Canyon Channel in Orange County, California. It was built in 1929 and reconstructed in 1938, so it is 96 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 20,709 vehicles a day, roughly 2% of them trucks, projected to reach 43,781 by 2041. The structure is 30 ft (9.1 m) long and 56 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Brea Canyon Blvd. over Brea Canyon Channel built?
It was built in 1929, making it 96 years old in 2025. It was reconstructed in 1938.
What condition is Brea Canyon Blvd. over Brea Canyon Channel in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Brea Canyon Blvd. over Brea Canyon Channel carry?
About 20,709 vehicles per day (2018 count), of which roughly 2% are trucks.
How long is Brea Canyon Blvd. over Brea Canyon Channel?
The structure is 30 ft (9.1 m) long with a longest span of 14 ft (4.3 m) and a deck 56 ft wide.
Who owns Brea Canyon Blvd. over Brea Canyon Channel?
It is owned by the County Highway Agency.