US Bridges

Mercury Lane over Brea Canyon Channel

Good

Orange County, California · 0.2 Mi. E/O Berry Street · Structure no. 55C0644

Built
2000
25 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
67 ft
1 main span
Daily traffic
1,000
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

Mercury Lane over Brea Canyon Channel is a prestressed concrete stringer/multi-beam or girder carrying Mercury Lane over Brea Canyon Channel in Orange County, California. It was built in 2000, so it is 25 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,000 vehicles a day, roughly 2% of them trucks, projected to reach 2,153 by 2041. The structure is 67 ft (20.3 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesMercury Lane
CrossesBrea Canyon Channel
Location0.2 Mi. E/O Berry Street
RouteCity Street 0
Coordinates33.91955, -117.90394
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment4: Meets minimum tolerable limits to be left in place as is
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length67 ft (20.3 m)
Longest span64 ft (19.5 m)
Deck width36 ft (11 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2017)
Projected traffic2,153 by 2041
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Mercury Lane over Brea Canyon Channel built?

It was built in 2000, making it 25 years old in 2025.

What condition is Mercury Lane over Brea Canyon Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Mercury Lane over Brea Canyon Channel carry?

About 1,000 vehicles per day (2017 count), of which roughly 2% are trucks.

How long is Mercury Lane over Brea Canyon Channel?

The structure is 67 ft (20.3 m) long with a longest span of 64 ft (19.5 m) and a deck 36 ft wide.

Who owns Mercury Lane over Brea Canyon Channel?

It is owned by the City or Municipal Highway Agency.