190th Street over Dominguez Channel
GoodLos Angeles County, California · Btw Figueroa St/Vermnt Av · Structure no. 53C1263
- Built
- 1966
- 59 years old, rebuilt 1970
- Condition
- Good
- inspected June 2023
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 222 ft
- 4 main spans
- Daily traffic
- 35,500
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
190th Street over Dominguez Channel is a concrete continuous box beam or girders - multiple carrying 190th Street over Dominguez Channel in Los Angeles County, California. It was built in 1966 and reconstructed in 1970, so it is 59 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 35,500 vehicles a day, roughly 3% of them trucks, projected to reach 56,075 by 2041. The structure is 222 ft (67.7 m) long and 92 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 190th Street over Dominguez Channel built?
It was built in 1966, making it 59 years old in 2025. It was reconstructed in 1970.
What condition is 190th Street over Dominguez Channel in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does 190th Street over Dominguez Channel carry?
About 35,500 vehicles per day (2020 count), of which roughly 3% are trucks.
How long is 190th Street over Dominguez Channel?
The structure is 222 ft (67.7 m) long with a longest span of 60 ft (18.3 m) and a deck 92 ft wide.
Who owns 190th Street over Dominguez Channel?
It is owned by the City or Municipal Highway Agency.