S110-N&S405 Conn over Dominguez Channel
FairLos Angeles County, California · 07-LA-110-9.13-LA · Structure no. 53 2557H
- Built
- 1985
- 40 years old
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 309 ft
- 3 main spans
- Daily traffic
- 29,950
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
S110-N&S405 Conn over Dominguez Channel is a prestressed concrete continuous stringer/multi-beam or girder carrying S110-N&S405 Conn over Dominguez Channel in Los Angeles County, California. It was built in 1985, so it is 40 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 29,950 vehicles a day, roughly 6% of them trucks, projected to reach 36,418 by 2044. The structure is 309 ft (94.2 m) long and 50 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S110-N&S405 Conn over Dominguez Channel built?
It was built in 1985, making it 40 years old in 2025.
What condition is S110-N&S405 Conn over Dominguez Channel in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does S110-N&S405 Conn over Dominguez Channel carry?
About 29,950 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is S110-N&S405 Conn over Dominguez Channel?
The structure is 309 ft (94.2 m) long with a longest span of 102 ft (31.1 m) and a deck 50 ft wide.
Who owns S110-N&S405 Conn over Dominguez Channel?
It is owned by the State Highway Agency.